BPcore LogoBPcore Silicon
Silicon Proof

Don't Bet Your Tape-Out on Slideware.

Every claim we make is backed by verification data you can review.

We've seen too many teams discover IP problems at the worst possible moment—during integration, or worse, after tape-out. That's why we built our verification methodology around one principle: no surprises.

Verification Evidence

What we can show you before you commit.

AreaMetricDetailsEvidence Available
Functional Coverage> 95%Across all operational modesCoverage database available under NDA
Code Coverage> 90%Statement, branch, condition, toggleCoverage reports from VCS
Formal VerificationAll properties provenCritical control pathsVC Formal proof certificates
Lint Compliance0 violationsSpyglass DFT, CDC, RDCClean lint reports
Synthesis ResultsTiming cleanMulti-corner, multi-modeSynopsys DC logs and reports
Power AnalysisCharacterizedPrimeTime PX with real activityPower reports with switching factors

What This Means for Your Project

Reduced Integration Risk

The bugs that kill tape-out schedules are usually found during integration, when IP meets reality. Our verification methodology catches these issues before delivery.

Predictable Schedule

When IP is truly production-ready, integration follows a predictable path. No multi-month debugging sessions, no architecture rework, no "we found a fundamental issue" surprises.

Confident Tape-Out

Sign off on silicon knowing the NPU block has been verified to production standards, not "it worked in simulation a few times."

Defensible Decision

When management asks "how do we know this IP is ready?", you have evidence to show them, not just vendor promises.

Tape-Out Readiness Checklist

Standard criteria we meet before delivery.

CriteriaStatusNotes
RTL Freeze✓ CompleteNo open issues, all ECOs resolved
Verification Signoff✓ CompleteCoverage goals met, regression clean
Synthesis Closure✓ CompleteTiming met across all corners
Power Signoff✓ CompleteWithin budget, no thermal issues
DFT IntegrationReadyScan insertion points defined, BIST optional
Documentation✓ CompleteIntegration guide, register reference, errata

Typical Integration Timeline

What to expect after licensing.

PhaseTypical DurationDescription
License & NDA1-2 weeksAgreement terms, IP transfer preparation
IP Delivery1 weekSecure transfer, access setup, initial review
Integration Planning2-4 weeksArchitecture mapping, interface definition, memory planning
RTL Integration4-8 weeksBus integration, clock domain crossing, top-level connection
Verification6-12 weeksSystem-level verification, use-case validation
Physical Design8-16 weeksSynthesis, P&R, timing closure (customer responsibility)

Total typical timeline: 6-12 months from license to tape-out ready, depending on your team's experience and project complexity.

Risk Mitigation

How we help you avoid common IP integration failures.

RiskMitigationSupport Included
Integration ComplexityStandard interfaces (AXI4, APB), proven integration examplesArchitecture review sessions included
Verification GapsComplete UVM environment, coverage-driven methodologyVerification consultation available
Timing ClosureProven synthesis scripts, multi-corner constraintsPhysical design guidance included
Power OverrunsCharacterized power data, clock gating already implementedPower optimization consultation available
Schedule SlipProduction-ready IP reduces integration unknownsDedicated support accelerates resolution

Your Due Diligence Process

We expect serious teams to verify our claims. Here's how:

1

Initial Technical Call

Architecture overview, fit assessment, initial questions answered

2

NDA & Deep Dive

Detailed documentation review, verification reports, architecture spec

3

Technical Q&A

Your architects talk to our architect, detailed technical questions

4

Evaluation (if needed)

Limited evaluation license for hands-on assessment (separate terms)

5

Commercial Discussion

Licensing terms, support options, timeline alignment

Ready to Verify Our Claims?

We welcome skepticism. It's how good engineering decisions get made.